Skip to content
American Hydro
American HydroAmerican Hydro
  • Home
  • About
  • Products and Services
  • Quality and Safety
  • Careers
  • Contact
  • Home
  • About
  • Products and Services
  • Quality and Safety
  • Careers
  • Contact

Portfolio Archives: Francis Runners

ZoomDetails

Friant Quinten Luallen

Field Services, Francis Runners, New EquipmentBy American HydroJune 17, 2026

Friant Quinten Luallen Location: Friant, California Size: 1.24 m (49”) Power: 6.89 MW Net Head: 71.6 m (235 ft.) Scope of Work: New vertical Francis turbine New generator New excitation New governor and controls New turbine inlet valve New synchronous bypass valve Technical assistance during installation and commissioning On-site training

ZoomDetails

Osage Units 1 and 2

Field Services, Francis Runners, New Equipment, Upgrades & RefurbishmentBy American HydroJune 17, 2026

Osage Units 1 and 2 Location: Lakeside, Missouri Size: 4.1 m (165”) Power: 35.5 MW Scope of Work: Model Test New Francis Runners New wicket gates Greaseless bushings and pads Facing plates, seal rings, wear rings, servomotor pins Thrust runner High Lift System Draft Tube Platform Air Admission / Dissolved Oxygen System Rehabilitation of headcover,…

ZoomDetails

Keokuk

Francis Runners, New Equipment, Upgrades & RefurbishmentBy American HydroApril 23, 2026

Keokuk Location: Keokuk, Iowa Size: 5.06 m (203″) Power: 12 MW Net Head: 10.9 m (36 ft) Scope of Work: 13 Units Model Test New Francis Runners Turbine Rehabilitation Field Machining New Wicket Gates, Stems and Stay Vane Assemblies On Site Stay Vane Assembly Installation Disassembly / Reassembly

ZoomDetails

Sir Adam Beck

Francis Runners, New EquipmentBy American HydroApril 23, 2026

Sir Adam Beck Location: Ontario, Canada Size: 3.12 m Power: 57 MW Net Head: 89 m Scope of Work: Scale model testing Eight new Francis runners

©2026 American Hydro
Privacy Policy | Modern Slavery Report | QA Vendor Letter

Go to Top